Curved Swords in Elden Ring remain a formidable weapon class, known for their swift attacks, excellent damage potential, and rapid status effect buildup, particularly when wielded in pairs. While some adjustments have been made to their balance over the years, they continue to offer a versatile and effective playstyle for Tarnished of all levels. The release of the Shadow of the Erdtree expansion in 2024 introduced several new Somber Smithing Stone weapons to this category, each with unique attributes, further enriching the arsenal available to players navigating the challenges of the Lands Between and the Land of Shadow in 2026.

19. Falchion
A weapon that faces a common dilemma among standard armaments, the Falchion is consistently overshadowed by the superior Bandit's Curved Sword in both damage output and reach. Its shorter blade length places it at a disadvantage in most engagements. However, it finds a niche when customized with Sacred or Flame Art Affinities, as these benefit from strong Faith scaling. For those drawn to its aesthetic, it can be acquired early by farming from Demi-Humans scattered across the Lands Between.

18. Grossmesser
This solid blade boasts above-average length for its class and performs admirably with the Heavy Affinity, making it a decent choice for Strength-oriented builds. Yet, it ultimately falls victim to the same superior competitor, the Bandit's Curved Sword, which outpaces it in both reach and damage potential. The performance gap on a Heavy build is minimal, so it remains a viable option for players who prefer its visual design. It can be obtained by farming Skeletons that wield it with one empty hand.

17. Scimitar
While not a powerhouse in raw damage or range, the Scimitar possesses a distinctive trait: a unique, faster one-handed light attack moveset that propels the wielder further forward. This makes it surprisingly effective for hybrid playstyles, pairing well with a shield for defense or a sacred seal/staff for spellcasting. The Warrior class begins with two, but others can purchase it from the Twin Maiden Husks or farm it from Skeletons carrying a small shield.

16. Shotel
Characterized by its short length and subpar damage, the Shotel's true value lies in its unique ability to partially bypass an enemy's guard, dealing damage through shields. This makes it a strategic counter against shield-bearing foes. Unlike other weapons with this property, the Shotel can be customized with any Ash of War, offering greater flexibility. It is sold by the Abandoned Merchant in the Siofra River region.

15. Shamshir
Essentially an enhanced version of the Scimitar, the Shamshir shares its advantageous one-handed moveset but offers superior length and improved damage across most affinities. It is the preferred choice for players who enjoy the Scimitar's style but seek better combat performance. Adventurers can loot it from a corpse in the depths of Highroad Cave in Stormhill.

14. Flowing Curved Sword
This weapon trades top-tier statistics for exceptional flair. Its unique heavy attacks are flowing combos, striking twice uncharged and three times when charged, offering a stylish and engaging combat rhythm. It is, however, an endgame acquisition, found within a carriage in the Consecrated Snowfield, an area locked behind a specific quest line.

13. Spirit Sword (DLC)
A Somber weapon introduced in the Shadow of the Erdtree DLC, the Spirit Sword deals innate Magic damage but struggles to compete with its base-game counterpart, the Wing of Astel. Its damage is lower, and it lacks the Wing's special moveset. Its Weapon Skill, Rancor Slash, is a frostbite-infused variant of Sword Dance that summons pursuing spirits, but it is often outperformed by simply applying the Cold affinity to a stronger curved sword. It is located on the Cerulean Coast.

12. Nox Flowing Sword
A deceptively useful blade, the Nox Flowing Sword combines the shield-piercing property of Shotel-type weapons with a highly effective Weapon Skill, Flowing Form. This skill extends the blade for a wide, sweeping attack, excellent for crowd control and catching distant foes. These traits make it particularly potent in player-versus-player encounters but remain valuable in PvE as well. It is a drop from the Nox Swordstress & Nox Monk boss in Sellia, Town of Sorcery.

11. Mantis Blade
This weapon presents a fascinating duality. In its standard state, it is the shortest curved sword with mediocre damage. However, its charged heavy attack unfolds the blade, granting it a massive, temporary range extension that briefly makes it the longest weapon in its class. This mechanic is perfect for surprising opponents in PvP or maintaining a safe distance in PvE. It is a guaranteed drop from a Lesser Cemetery Shade in Gelmir Hero's Grave.

10. Serpent-God's Curved Sword
Valued not for its offensive power but for its unparalleled utility, this weapon provides a small heal whenever the wielder defeats an enemy. Crucially, this passive effect remains active whether the sword is actively used or merely equipped on the back, functioning without consuming Talisman slots or Great Rune charges. It is an exceptional tool for sustaining health during exploration and clearing dungeons, though less useful in solo boss fights. It can be found in the Ruin-Strewn Precipice.
Key Considerations for Curved Sword Builds in 2026:
-
Dual-Wielding: Remains the most potent method for maximizing damage and status buildup (like Bleed or Frost).
-
Affinity Synergy: Choosing the correct Ash of War and Affinity (Heavy for Strength, Keen for Dexterity, Magic/Cold for Intelligence) is crucial for scaling.
-
Unique Movesets: Weapons like the Scimitar, Shamshir, Mantis Blade, and Flowing Curved Sword offer alternative attack patterns that can define a playstyle.
-
Utility Over Damage: Tools like the Serpent-God's Curved Sword and shield-piercing weapons (Shotel, Nox Flowing Sword) provide strategic advantages beyond raw AR (Attack Rating).
-
DLC Additions: The Shadow of the Erdtree Somber weapons, like the Spirit Sword, offer new magic-based options but must be evaluated against established favorites.
Ultimately, the "best" curved sword is highly dependent on the player's build objectives, preferred playstyle, and whether they prioritize maximum damage, unique mechanics, or supportive utility. The class continues to offer a rich diversity of options for conquering the ever-challenging realms of Elden Ring.